5896  JAN LONG LEAD
  • 5896  JAN LONG LEAD
  • 5896  JAN LONG LEAD
Philips

5896 JAN LONG LEAD

6.00 USD

Premium Mil. Spec. sub miniature glass double diode tubes manufactured in the United States by Philips. With black plates and top getters, these 8 wire lead tubes are designed for service under conditions of severe shock, vibration, high temperature and altitude. Printed JAN 5896 PHILIPS ECG USA with 1981 production code, they are boxed in standard military white boxes NATO coded 5960-00-248-3091 under contract no. 2PX80-06081.

Condition

Tube Matching
Tube Matching
6.00 USD by tube

WHY ?

A tube may have one, two, or three internal sections depending on the purpose of the tube; somtimes these sections are all the same, sometimes they are different. Due to manufacturing and material tolerances, there may be slight differences between the original specification and the actual tube. Tube matching tests each one of these internal sections and selects tubes, compared to original specifications at manufacture, for balanced performance and good sound.

HOW ?

All our tubes are tested by us prior to packing on our Stark, AVO, Simpson or RF Laboratories Inc. calibrated testers. On request for tube matching, tubes are matched for Mutual Conductance in Micromhos and Plate Current in Milliamps on our Amplitrex or Radioelec Duovac testers, with results printed for each  individual tube. Certain tubes difficult to test are matched for Mutual Conductance in Micromhos only on one of our regular calibrated testers. On request we can also test for Microphonics.

Quantity

Philips
100 Items

Data sheet

Base
Wire
Boite type
1/1
Emplacement
46
Quide
1300
Fonction
Double diode